The scope of work comprised of the project management, engineering, inshore loading (Aalborg), offshore transport and installation onto pre-installed Mono Piles of 80 Transition Pieces. Jumbo’s detailed scope also included the design and supply of all installation aids, lifting gear, grillages and sea fastenings.

Download the OWP Butendiek development project specifications.

Related projects

Renewables
April 19, 2015

Anholt offshore windfarm development

RENEWABLES PROJECT Anholt offshore windfarm development JUMBO JAVELIN | DENMARKThe scope of work comprised of the project management, engineering, inshore loading (Aalborg), offshore transport and installation onto pre-installed Mono Piles…
Renewables
April 1, 2022

OWP Butendiek Development

RENEWABLES OWP Butendiek Development JUMBO JAVELIN | AALBORG The scope of work comprised of the project management, engineering, inshore loading (Aalborg), offshore transport and installation onto pre-installed Mono Piles of…
Close Menu