PAPA TERRA field

By March 17, 2023No Comments

PAPA TERRA field

Tension Leg Wellhead Platform (TLWP), piles and tendons installation (support)

Home » PAPA TERRA field

Scope of work

Project For all 8 Piles, the 128 Tendon Segments and 8 Temporary Buoyancy Modules, Jumbo’s scope of work included the project management, engineering, load-out & seafastening (Morgan City, USA), onward transportation to Brazil and on-site tandem lifting (from own deck), upending and hand-over to the Main Installation Vessel (DB-50).
Location P-61, Block BC-20, Campos Basin, Brazil
Water depth 1180 m
Client/Operator McDermott/Petrobras (with Chevron)
Award date
Installation date
Q3 2012
Q4 2013 – Q1 2014
SIMILAR PROJECTS

Load-out, transport and installation

The scope of work comprises the receipt, marshalling and preparation for installation of mooring components. Load-out, transport and installation of 24-off T-120 torpedo mooring pile and bottom chains. Components for Riser and Umbilical mooring system consisting of 11-off T- 35 torpedo mooring pile and bottom chains.

Phase 2

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Phase 3

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Technical data

Quantity / Size / Weight 8 TLWP Pile-Tendon-Buoy assemblies with a t total weight of 11,000 t. Each assembly comprised of:
• Driven Anchor Pile: 84” x 104 m (314 t)
• Tendon: 32” x 73 m (60 t/ea)
• TBM: Ø 11 m x 17 m (130 t)

Equipment Resources

Installation Vessel


Key Equipment

HLCV Fairplayer (Piles and TBMs)
HLCV Jumbo Javelin (Tendons and TBMs)

• Grillage and Seafastening
• Pile access platform and hang-off frame
• Tendon make ready station and hang off frame
MORE ABOUT THE VESSEL
WANT TO KNOW MORE?
CONTACT US

SHARE THIS PROJECT

Video highlights of the project

Related projects

COMPLETED IN 2021

Jumbo Yunlin Transport Scope

40 monopiles, 120 monopile sections and 40 transition pieces

Yunlin Offshore Wind Farm

Taiwan Strait, Taiwan

MORE INFO

COMPLETED IN 2021

Maximizing transport for DEME offshore

Monopile and transition piece transport, 37 voyages

Hornsea Two Offshore Wind Farm

North Sea

MORE INFO

COMPLETED IN 2018

The Arkona offshore wind farm project

Transportation and installation of the 60 transition pieces

385MW Offshore wind farm

German Baltic Sea

MORE INFO