Karish FPSO mooring installation
Pre-installation of deep water mooring and tie-in manifold
Scope of work
Project | Comprises the Transport and Installation of the FPSO mooring system in 1760 m WD and the (near-shore) Tie-In Manifold in 70m WD. |
Location | Karish Gas Field, Israel |
Water depth | 70-1760 m |
Client/Operator | TechnipFMC / Energean Oil & Gas |
Installation date | Q2 2019/Q3 2020 |
Mooring system installed in 1,760m sea depth
The scope of work comprises the Transport and Installation of the FPSO mooring system in 1760 m WD and the (near-shore) Tie-In Manifold in 70m WD.
Jumbo Maritime installed the components on behalf of TechnipFMC at a depth of 1760 metres which was a new deep-water installation record.
Technical data
Quantity / Size / Weight | FPSO Mooring System: • Suction Anchor: Ø 9.0 m x 15 m (247 t) • Suction Anchor: Ø 7.5 m x 15 m (187 t) • Polyester Mooring Lines: Ø 195 mm x 3100 m • Chains: Ø 127 mm x 200+149 m |
Tie-In Manifold:
• TIM: 30 m 23 m x 15 m (609 t) |
Equipment Resources
Installation Vessel
Key Equipment |
HLCV Fairplayer • 2x Work Class ROV • SPT SAPS-008 Suction Spread • Rope deployment Reel + RDS • Chain Gypsy Winch |
WANT TO KNOW MORE?
Video highlights of the project
Related projects
COMPLETED IN 2021
Jumbo Yunlin Transport Scope
40 monopiles, 120 monopile sections and 40 transition pieces
Yunlin Offshore Wind Farm
Taiwan Strait, Taiwan
COMPLETED IN 2021
Maximizing transport for DEME offshore
Monopile and transition piece transport, 37 voyages
Hornsea Two Offshore Wind Farm
North Sea
COMPLETED IN 2018
The Arkona offshore wind farm project
Transportation and installation of the 60 transition pieces
385MW Offshore wind farm
German Baltic Sea
DO YOU HAVE
ANY QUESTIONS?
Please contact our specialist
Brian Boutkan
Manager Commerce Offshore
T: +31 (0)10 7900 300
M: +31 (0)6 11 92 66 10
E: b.boutkan@jumbomaritime.nl