Greater Stella area development
Provision of FPSO (FPF-1) mooring system installation
Scope of work
Project | Comprised of the engineering, onshore marshalling, inshore loading (Rotterdam), offshore transport and installation, including pre-tensioning, of all mooring lines at location. Each mooring line consisted of several chain/tri-chain sections, shackles, tri-plates, H-links and spiral strand wires (SSWs) connected to a mooring pile driven into the seabed. In addition, a SAL anchor pile is installed. |
Location | Central North Sea, UK Block 29/10a & 30/6a |
Water depth | 90 m |
Client/Operator | Ithaca Energy Inc. |
Award date Installation date |
Q1 2014 Q3 2014 |
Load-out, transport and installation
The scope of work comprises the receipt, marshalling and preparation for installation of mooring components. Load-out, transport and installation of 24-off T-120 torpedo mooring pile and bottom chains. Components for Riser and Umbilical mooring system consisting of 11-off T- 35 torpedo mooring pile and bottom chains.
Phase 2
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Phase 3
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Technical data
Quantity / Size / Weight | 12-leg FPSO mooring comprising of: • 12+1 x 84” x 35 m Driven Anchor Piles • 7 km of Ø 120 mm Chain / Ø 127mm Tri-Chain • 9.5 km of Ø 115 mm sheathed Spiral Strand Wire |
Equipment Resources
Installation Vessel
Key Equipment |
HLCV Fairplayer and OCV Olympic Hera • IHC S-800 Hydrohammer • 84” ILT • 72”- 96” Fast Frame • SSW RDS + 20 t tensioner • 50 t Pull Chain Winch • 2 x Work Class ROV |
WANT TO KNOW MORE?
Video highlights of the project
Related projects
COMPLETED IN 2021
Jumbo Yunlin Transport Scope
40 monopiles, 120 monopile sections and 40 transition pieces
Yunlin Offshore Wind Farm
Taiwan Strait, Taiwan
COMPLETED IN 2021
Maximizing transport for DEME offshore
Monopile and transition piece transport, 37 voyages
Hornsea Two Offshore Wind Farm
North Sea
COMPLETED IN 2018
The Arkona offshore wind farm project
Transportation and installation of the 60 transition pieces
385MW Offshore wind farm
German Baltic Sea