Skip to main content
Projects

Greater Gabbard

By March 17, 2023No Comments

Greater Gabbard

Transport and installation of 131 transition pieces

Home » Greater Gabbard

Scope of work

Project Transport and installation of 131 Transition Pieces (TPs). Each trip, in the port of Flushing, the Jumbo Javelin loaded nine TPs stowing them vertically in the hold. At the offshore location Jumbo positioned itself on DP and placed the TPs on pre-installed monopiles. The TPs were then levelled to their final position and grouted.
Location South East of England
Water depth 22-32 m
Client/Operator Fluor
Award date
Installation date
Q1 2009
Q2/Q3 2010
SIMILAR PROJECTS

Load-out, transport and installation

The scope of work comprises the receipt, marshalling and preparation for installation of mooring components. Load-out, transport and installation of 24-off T-120 torpedo mooring pile and bottom chains. Components for Riser and Umbilical mooring system consisting of 11-off T- 35 torpedo mooring pile and bottom chains.

Phase 2

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Phase 3

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Technical data

Quantity / Size / Weight 131 Transition Pieces:
• Ø 5.5 m
• Height 23 m
• Weight 280 t

Equipment Resources

Installation Vessel

Key Equipment

HLCV Jumbo Javelin
• 2 x 300 t SWL Passive Heave Compensators
• Motion Compensated Gangway (Ampelmann)
• Remotely controlled hydraulic lifting beam
• Survey spread
• Grouting spread
MORE ABOUT THE VESSEL
WANT TO KNOW MORE?
CONTACT US

SHARE THIS PROJECT

Related projects

COMPLETED IN 2021

Jumbo Yunlin Transport Scope

40 monopiles, 120 monopile sections and 40 transition pieces

Yunlin Offshore Wind Farm

Taiwan Strait, Taiwan

MORE INFO

COMPLETED IN 2021

Maximizing transport for DEME offshore

Monopile and transition piece transport, 37 voyages

Hornsea Two Offshore Wind Farm

North Sea

MORE INFO

COMPLETED IN 2018

The Arkona offshore wind farm project

Transportation and installation of the 60 transition pieces

385MW Offshore wind farm

German Baltic Sea

MORE INFO

DO YOU HAVE
ANY QUESTIONS?

Please contact our specialist
Close Menu