Skip to main content
LNG

Loading a LNG module

By August 21, 2008March 22nd, 2022No Comments
LNG PROJECT

Loading a LNG module

FAIRPARTNER

Home » Loading a LNG module

Jumbo Shipping completed a challenging project that really put its engineering and logistic departments plus the ship crews to the test. For example, in the engineering phase, a detailed 3D analysis was needed to develop the lifting plans for the voluminous LNG loading module. During execution the module was maneuvered step-by-step and very accurately between the Fairpartner’s mast cranes.

Related projects

LNG
July 1, 2015

Jumbo transports large spherical tank

LNG PROJECT Jumbo transports large spherical tank HLV FAIRPARTNER | AUSTRALIAIn July 2015, HLV Fairpartner was subcontracted to transport a 600t spherical tank and associated equipment from a client’s fabrication…
LNG
August 21, 2008

Loading a LNG module

LNG PROJECT Loading a LNG module FAIRPARTNERJumbo Shipping completed a challenging project that really put its engineering and logistic departments plus the ship crews to the test. For example, in…
Close Menu