Wheatstone subsea installation

By March 17, 2023June 29th, 2023No Comments

Wheatstone subsea installation

Heavy lift installation of subsea structures

Home » Wheatstone subsea installation

Scope of work

Project Comprised of the project management, engineering, load-out & seafastening (Singapore/Dampier), transport to site, on-site survey and final offshore installation (4 campaigns) of 16 Subsea Manifolds, SSIVs, PLETs and Mudmat Structures up to a weight of 527 mT.
Location Wheatstone Field, Western Australia
Water depth 72-240 m
Client/Operator TechnipFMC (Oceania) / Chevron
Award date
Installation date
Q4 2014
Q2 2015
SIMILAR PROJECTS
Wheatstone subsea installation, technip fmc

Load-out, transport and installation

The project encompassed various tasks including project management, engineering, load-out, seafastening in Singapore/Dampier, transportation to the site, on-site survey, and final offshore installation in four campaigns.

The installation involved 16 Subsea Manifolds, SSIVs, PLETs, and Mudmat Structures, with a combined weight of up to 527 metric tons.

Thorough and meticulous planning was crucial for the success of the project. Every detail was taken into account, ensuring early preparation, involvement, training, and familiarization of all local stakeholders for the Australian works. Full compliance with environmental programs was strictly followed, leading to a seamless offshore performance that exceeded expectations.

Technical data

Quantity / Size / Weight Various Subsea Structures:
• Manifolds: 3 off, weight range 446-527 t
• SSIV: 4 off, weight range 362-491 t
• PLET: 6 off, weight range 136-454 t
• Mudmats: 3 off, weight range 13-28 t

Equipment Resources

Installation Vessel

Key Equipment

HLCV Fairplayer
• 700 t Passive Heave Compensator
• 2 x FCV-3000 Work Class ROV
• Lifting gear

MORE ABOUT THE VESSEL
WANT TO KNOW MORE?
CONTACT US

SHARE THIS PROJECT

Video highlights of the project

Related projects

COMPLETED IN 2021

Jumbo Yunlin Transport Scope

40 monopiles, 120 monopile sections and 40 transition pieces

Yunlin Offshore Wind Farm

Taiwan Strait, Taiwan

MORE INFO

COMPLETED IN 2021

Maximizing transport for DEME offshore

Monopile and transition piece transport, 37 voyages

Hornsea Two Offshore Wind Farm

North Sea

MORE INFO

COMPLETED IN 2018

The Arkona offshore wind farm project

Transportation and installation of the 60 transition pieces

385MW Offshore wind farm

German Baltic Sea

MORE INFO

DO YOU HAVE
ANY QUESTIONS?

Please contact our specialist
Close Menu