Pierce field lifetime extension

By March 17, 2023June 29th, 2023No Comments

Pierce field lifetime extension

Replacement of Haewene BRIM FPSO mooring system

Home » Pierce field lifetime extension

Scope of work

Project Jumbo’s scope of work for this extremely short-track project consisted of the Transport and Installation of 8-off anchor piles including installation and pre-tensioning of 8-off bottom chain segments (200t tension at seabed). Finally, 5-off Spiral Strand Wires had to be connected to 5-off bottom chain segments and abandoned on the seabed.
Location Pierce Field, UK Block 23/22a and 23/27
Water depth 86 m
Client/Operator Bluewater Energy Services / Shell
Award date
Installation date
Q1 2016
Q2 2016
SIMILAR PROJECTS
Pierce field lifetime extension, Bluewater

Replacement of Haewene Brim FPSO mooring system

As part of an ongoing program to extend the lifetime of the Bluewater-owned FPSO Haewene Brim, it was necessary to replace the existing mooring system. Jumbo was tasked with the Transport and Installation of 8 anchor piles sourced from Germany, which were to be driven into the seabed in the Pierce field (offshore Aberdeen).

This project involved not only the installation and pretensioning of 8 bottom chain segments, each with a tension of 200 tons at the seabed, but also the connection of 5 Spiral Strand Wires to 5 bottom chain segments, which were subsequently abandoned on the seabed.

Within a tight timeframe of 3 months from the contract award and while adhering to the given installation window, Jumbo successfully completed the offshore installation in a safe and efficient manner. Additionally, Jumbo designed and utilized a pile guide frame to ensure precise installation of the anchor piles according to the tolerances specified by the client.

Technical data

Quantity / Size / Weight 8-leg FPSO Mooring System comprising of:
• 8 x 84” 25,5 m Driven Anchor Piles
• 1,290 m of Ø 147 mm Chain
• 2,300 m of Ø 152 mm sheathed Spiral Strand Wire

Equipment Resources

Installation Vessel

Key Equipment

HLCV Fairplayer and OCV Olympic Zeus
• Menck MHU-500T Hammer
• ILT
• Pile Guide Frame (purpose-built)
• SSW Reel Drive System
• 2 x Work Class ROVs
• Gypsy Winch for chain handling

MORE ABOUT THE VESSEL
WANT TO KNOW MORE?
CONTACT US

SHARE THIS PROJECT

Related projects

COMPLETED IN 2021

Jumbo Yunlin Transport Scope

40 monopiles, 120 monopile sections and 40 transition pieces

Yunlin Offshore Wind Farm

Taiwan Strait, Taiwan

MORE INFO

COMPLETED IN 2021

Maximizing transport for DEME offshore

Monopile and transition piece transport, 37 voyages

Hornsea Two Offshore Wind Farm

North Sea

MORE INFO

COMPLETED IN 2018

The Arkona offshore wind farm project

Transportation and installation of the 60 transition pieces

385MW Offshore wind farm

German Baltic Sea

MORE INFO

DO YOU HAVE
ANY QUESTIONS?

Please contact our specialist
Close Menu