FSRU Moheshkhali
Transport, installation Moheshkhali FSRU mooring system
Scope of work
Project | Comprised the load-out, transport and offshore installation of FSRU mooring system components consisting of 8-off anchor piles including installation of 8-off bottom chain segments and a PLEM and PAD landing structure for the turret (PLUG) |
Location | Offshore Moheskhali Island, Bangladesh |
Water depth | 39 m |
Client/Operator | Geocean / Excelerate Energy |
Execution | Q4-2017 — Q1-2018 |
Transport, installation mooring system for floating storage regasification unit
The project encompassed the load-out, transportation, and offshore installation of various components for the FSRU mooring system. This included the installation of 8 anchor piles, along with 8 bottom chain segments and a PLEM and PAD landing structure for the turret (PLUG). Additionally, Jumbo successfully deployed over 150 rock bags to provide scour protection around the subsea structures.
Throughout the project, our crew encountered challenging conditions such as strong currents, limited visibility, and a remote location. However, their remarkable resourcefulness and unwavering determination enabled them to complete the project according to specifications, demonstrating exceptional performance.
Technical data
Quantity / Size / Weight | MacGregor Mooring System Components: • Suction Anchor: Ø 9 m x 11,3 m (119 t) • Bottom Chain: Ø 84 mm x 70 m (10 t) • PAD structure: Ø 14,6 m x 2,15 m (84 t) • LEM: 12,5 m x 7,9 m x 4,2 m (114 t) |
Equipment Resources for the FSRU Moheshkhali project
Installation Vessel
Key Equipment |
HLCV Jumbo Javelin • Safelink Poseidon 4500 Passive heave compensator • 2x SAPS-004 SPT suction pumps • 2x Work Class ROVs |
WANT TO KNOW MORE?
Video highlights of the project
Related projects
COMPLETED IN 2021
Jumbo Yunlin Transport Scope
40 monopiles, 120 monopile sections and 40 transition pieces
Yunlin Offshore Wind Farm
Taiwan Strait, Taiwan
COMPLETED IN 2021
Maximizing transport for DEME offshore
Monopile and transition piece transport, 37 voyages
Hornsea Two Offshore Wind Farm
North Sea
COMPLETED IN 2018
The Arkona offshore wind farm project
Transportation and installation of the 60 transition pieces
385MW Offshore wind farm
German Baltic Sea
DO YOU HAVE
ANY QUESTIONS?
Please contact our specialist
Brian Boutkan
Manager Commerce Offshore
T: +31 (0)10 7900 300
M: +31 (0)6 11 92 66 10
E: b.boutkan@jumbomaritime.nl