Skip to main content
Projects

Shell Vito

By March 17, 2023December 14th, 2023No Comments

Shell Vito

Transport and installation mooring system

Home » Shell Vito

Scope of work

Project Comprises the fabrication of suction piles, marshalling and load -out, transport and offshore installation of mooring system components consisting of 12 -off anchor piles including installation of 12-off ground chain segments, polyester ropes, platform chain and ILMT.
Location US Gulf of Mexico, MC Block 939
Water depth 1250 m
Client/Operator Shell Offshore Inc.
Execution Suction Piles in Q2 2019 / Mooring Lines 2020
SIMILAR PROJECTS

Load-out, transport and installation

The Vito project is situated in the Mississippi Canyon, about 242 kilometers south of New Orleans, Louisiana, USA. It is positioned in water depths exceeding 1200 meters. A total of eight subsea wells with deep in-well gas lift was part of the development. The installation contract involved the initial pre-lay of the mooring system as well as the subsequent tow and hook-up of the FPS.

Technical data

Quantity / Size / Weight Mooring System Components (each leg):
• Suction Anchor: Ø 5,5 m x 24,3 m (173 t)
• Ground Chain: Ø 135 mm x 215 m
• Polyester Rope: 2 x 1075 m 207 mm
• Adjustment Chain: Ø 130 mm x 300 m

Equipment Resources

Installation Vessel

Key Equipment

 Phase 1 – HLCV Fairplayer
• Passive heave compensator
• 2x Work Class ROVs with Suction Pumps
• LBL Survey spread
Phase 2 – HLCV Fairplayer
• RDS / 4-track Tensioner

• Karmoy Chain Winch
• 2 x Work Class ROVs
MORE ABOUT THE VESSEL
WANT TO KNOW MORE?
CONTACT US

SHARE THIS PROJECT

Related projects

COMPLETED IN 2021

Jumbo Yunlin Transport Scope

40 monopiles, 120 monopile sections and 40 transition pieces

Yunlin Offshore Wind Farm

Taiwan Strait, Taiwan

MORE INFO

COMPLETED IN 2021

Maximizing transport for DEME offshore

Monopile and transition piece transport, 37 voyages

Hornsea Two Offshore Wind Farm

North Sea

MORE INFO

COMPLETED IN 2018

The Arkona offshore wind farm project

Transportation and installation of the 60 transition pieces

385MW Offshore wind farm

German Baltic Sea

MORE INFO

DO YOU HAVE
ANY QUESTIONS?

Please contact our specialist
Close Menu