Skip to main content
Projects

Petrobras Mero 1 – Contact anchor

By March 8, 2023March 17th, 2023No Comments

PETROBRAS MERO 1

Transport and installation FSPO Mooring System

Home » Petrobras Mero 1 – Contact anchor

Scope of work

Project Pre-laying services for the anchoring system of FPSO (Guanabara), Flexible Lines and Umbilicals on the Mero 1 Project.
Location Brazil Santos Basin, North East area of Libra block.
Water depth 2000 m
Client/Operator Petróleo Brasileiro SA – Petrobras
Installation date Q2/Q3 2021
SIMILAR PROJECTS

Load-out, transport and installation

The scope of work comprises the receipt, marshalling and preparation for installation of mooring components. Load-out, transport and installation of 24-off T-120 torpedo mooring pile and bottom chains. Components for Riser and Umbilical mooring system consisting of 11-off T- 35 torpedo mooring pile and bottom chains.

Phase 2

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Phase 3

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Technical data

Quantity / Size / Weight 24-leg FPSO Mooring System comprising:
• T-120 Torpedo Anchor Pile
• Chain: Ø 120 mm x 615 m
11 Flexible Riser and Umbilical Moorings comprising:
• T-35 Torpedo Anchor Pile
• Chain: Ø 76 mm x 30 m

Equipment Resources

Installation Vessel Key Equipment HLCV Fairplayer
• Torpedo Pile overboarding frame (purpose-built)
• Deployment winch
• 2 x Work Class ROVs
• Gypsy winch for chain handling
MORE ABOUT THE VESSEL
WANT TO KNOW MORE?
CONTACT US

SHARE THIS PROJECT

Video highlights of the project

Related projects

COMPLETED IN 2021

Jumbo Yunlin Transport Scope

40 monopiles, 120 monopile sections and 40 transition pieces

Yunlin Offshore Wind Farm

Taiwan Strait, Taiwan

MORE INFO

COMPLETED IN 2021

Maximizing transport for DEME offshore

Monopile and transition piece transport, 37 voyages

Hornsea Two Offshore Wind Farm

North Sea

MORE INFO

COMPLETED IN 2018

The Arkona offshore wind farm project

Transportation and installation of the 60 transition pieces

385MW Offshore wind farm

German Baltic Sea

MORE INFO

DO YOU HAVE
ANY QUESTIONS?

Please contact our specialist
Close Menu